A few weeks ago (9 to be exact!) I started another remodel.
The first part of the project- was to update this small bathroom.
(Before picture on the left, After on the right)
We converted the bath tub into a shower. We remade the vanity cabinet, installed granite and updated all the fixtures.
Here are a few close up pictures, so show the detail in the tile work.
The second part of this project, was to tackle this small bedroom/office.
(Before picture on the left, after on the right)
We removed the existing ceiling tiles.
We replace the carpet with vinyl plank (to match the bathroom and hallway).
Gave the room a fresh coat of paint.
We enlarged the closet, added a sliding barn door.
And to help make the room feel a bit larger, we added a large dressing mirror.
It is always a great pleasure to have my clients wishes and my vision come to life!
In the mean time, I have started another complete master bathroom remodel, a kitchen remodel starts
on Monday & another master shower remodel on Wednesday!
💞 love it!
ReplyDelete